PHP Version 5.2.9-2 |
System | Windows NT WIN2019WEB 6.2 build 9200 |
Build Date | Apr 9 2009 08:22:37 |
Configure Command | cscript /nologo configure.js "--enable-snapshot-build" "--enable-debug-pack" "--with-snapshot-template=d:\php-sdk\snap_5_2\vc6\x86\template" "--with-php-build=d:\php-sdk\snap_5_2\vc6\x86\php_build" "--with-pdo-oci=D:\php-sdk\oracle\instantclient10\sdk,shared" "--with-oci8=D:\php-sdk\oracle\instantclient10\sdk,shared" |
Server API | CGI/FastCGI |
Virtual Directory Support | enabled |
Configuration File (php.ini) Path | C:\Windows |
Loaded Configuration File | E:\PHP\php.ini |
Scan this dir for additional .ini files | (none) |
additional .ini files parsed | (none) |
PHP API | 20041225 |
PHP Extension | 20060613 |
Zend Extension | 220060519 |
Debug Build | no |
Thread Safety | enabled |
Zend Memory Manager | enabled |
IPv6 Support | enabled |
Registered PHP Streams | php, file, data, http, ftp, compress.zlib, compress.bzip2, https, ftps, zip |
Registered Stream Socket Transports | tcp, udp, ssl, sslv3, sslv2, tls |
Registered Stream Filters | convert.iconv.*, string.rot13, string.toupper, string.tolower, string.strip_tags, convert.*, consumed, zlib.*, bzip2.* |
This program makes use of the Zend Scripting Language Engine: Zend Engine v2.2.0, Copyright (c) 1998-2009 Zend Technologies |
Directive | Local Value | Master Value |
---|---|---|
allow_call_time_pass_reference | Off | Off |
allow_url_fopen | On | On |
allow_url_include | Off | Off |
always_populate_raw_post_data | Off | Off |
arg_separator.input | & | & |
arg_separator.output | & | & |
asp_tags | Off | Off |
auto_append_file | no value | no value |
auto_globals_jit | On | On |
auto_prepend_file | no value | no value |
browscap | no value | no value |
default_charset | no value | no value |
default_mimetype | text/html | text/html |
define_syslog_variables | Off | Off |
disable_classes | no value | no value |
disable_functions | no value | no value |
display_errors | Off | Off |
display_startup_errors | Off | Off |
doc_root | no value | no value |
docref_ext | no value | no value |
docref_root | no value | no value |
enable_dl | On | On |
error_append_string | no value | no value |
error_log | no value | no value |
error_prepend_string | no value | no value |
error_reporting | no value | no value |
expose_php | On | On |
extension_dir | E:\PHP\ext\ | E:\PHP\ext\ |
file_uploads | On | On |
highlight.bg | #FFFFFF | #FFFFFF |
highlight.comment | #FF8000 | #FF8000 |
highlight.default | #0000BB | #0000BB |
highlight.html | #000000 | #000000 |
highlight.keyword | #007700 | #007700 |
highlight.string | #DD0000 | #DD0000 |
html_errors | On | On |
ignore_repeated_errors | Off | Off |
ignore_repeated_source | Off | Off |
ignore_user_abort | Off | Off |
implicit_flush | Off | Off |
include_path | .;C:\php5\pear | .;C:\php5\pear |
log_errors | Off | Off |
log_errors_max_len | 1024 | 1024 |
magic_quotes_gpc | Off | Off |
magic_quotes_runtime | Off | Off |
magic_quotes_sybase | Off | Off |
mail.force_extra_parameters | no value | no value |
max_execution_time | 30 | 30 |
max_input_nesting_level | 64 | 64 |
max_input_time | 60 | 60 |
memory_limit | 128M | 128M |
open_basedir | no value | no value |
output_buffering | 4096 | 4096 |
output_handler | no value | no value |
post_max_size | 8M | 8M |
precision | 14 | 14 |
realpath_cache_size | 16K | 16K |
realpath_cache_ttl | 120 | 120 |
register_argc_argv | Off | Off |
register_globals | Off | Off |
register_long_arrays | Off | Off |
report_memleaks | On | On |
report_zend_debug | On | On |
safe_mode | Off | Off |
safe_mode_exec_dir | no value | no value |
safe_mode_gid | Off | Off |
safe_mode_include_dir | no value | no value |
sendmail_from | no value | no value |
sendmail_path | no value | no value |
serialize_precision | 100 | 100 |
short_open_tag | Off | Off |
SMTP | localhost | localhost |
smtp_port | 25 | 25 |
sql.safe_mode | Off | Off |
track_errors | Off | Off |
unserialize_callback_func | no value | no value |
upload_max_filesize | 2M | 2M |
upload_tmp_dir | C:\WINDOWS\Tmp | C:\WINDOWS\Tmp |
user_dir | no value | no value |
variables_order | GPCS | GPCS |
xmlrpc_error_number | 0 | 0 |
xmlrpc_errors | Off | Off |
y2k_compliance | On | On |
zend.ze1_compatibility_mode | Off | Off |
BCMath support | enabled |
BZip2 Support | Enabled |
Stream Wrapper support | compress.bz2:// |
Stream Filter support | bzip2.decompress, bzip2.compress |
BZip2 Version | 1.0.2, 30-Dec-2001 |
Calendar support | enabled |
Directive | Local Value | Master Value |
---|---|---|
cgi.check_shebang_line | 1 | 1 |
cgi.fix_pathinfo | 1 | 1 |
cgi.force_redirect | 0 | 0 |
cgi.nph | 0 | 0 |
cgi.redirect_status_env | no value | no value |
cgi.rfc2616_headers | 0 | 0 |
fastcgi.impersonate | 1 | 1 |
fastcgi.logging | 1 | 1 |
COM support | enabled |
---|---|
DCOM support | disabled |
.Net support | enabled |
Directive | Local Value | Master Value |
---|---|---|
com.allow_dcom | 0 | 0 |
com.autoregister_casesensitive | 1 | 1 |
com.autoregister_typelib | 0 | 0 |
com.autoregister_verbose | 0 | 0 |
com.code_page | no value | no value |
com.typelib_file | no value | no value |
ctype functions | enabled |
cURL support | enabled |
cURL Information | libcurl/7.19.4 OpenSSL/0.9.8k zlib/1.2.3 |
date/time support | enabled |
"Olson" Timezone Database Version | 2009.1 |
Timezone Database | internal |
Default timezone | Australia/Melbourne |
Directive | Local Value | Master Value |
---|---|---|
date.default_latitude | 31.7667 | 31.7667 |
date.default_longitude | 35.2333 | 35.2333 |
date.sunrise_zenith | 90.583333 | 90.583333 |
date.sunset_zenith | 90.583333 | 90.583333 |
date.timezone | no value | no value |
DBA support | enabled |
Supported handlers | cdb cdb_make db3 inifile flatfile |
DOM/XML | enabled |
DOM/XML API Version | 20031129 |
libxml Version | 2.7.3 |
HTML Support | enabled |
XPath Support | enabled |
XPointer Support | enabled |
Schema Support | enabled |
RelaxNG Support | enabled |
EXIF Support | enabled |
EXIF Version | 1.4 $Id: exif.c,v 1.173.2.5.2.27 2008/12/31 11:17:37 sebastian Exp $ |
Supported EXIF Version | 0220 |
Supported filetypes | JPEG,TIFF |
FDF Support | enabled |
FdfTk Version | 5.0 |
Input Validation and Filtering | enabled |
Revision | $Revision: 1.52.2.45 $ |
Directive | Local Value | Master Value |
---|---|---|
filter.default | unsafe_raw | unsafe_raw |
filter.default_flags | no value | no value |
FTP support | enabled |
GD Support | enabled |
GD Version | bundled (2.0.34 compatible) |
FreeType Support | enabled |
FreeType Linkage | with freetype |
FreeType Version | 2.1.9 |
T1Lib Support | enabled |
GIF Read Support | enabled |
GIF Create Support | enabled |
JPG Support | enabled |
PNG Support | enabled |
WBMP Support | enabled |
XBM Support | enabled |
GetText Support | enabled |
gmp support | enabled |
GMP version | 4.1.4 |
hash support | enabled |
Hashing Engines | md2 md4 md5 sha1 sha256 sha384 sha512 ripemd128 ripemd160 ripemd256 ripemd320 whirlpool tiger128,3 tiger160,3 tiger192,3 tiger128,4 tiger160,4 tiger192,4 snefru gost adler32 crc32 crc32b haval128,3 haval160,3 haval192,3 haval224,3 haval256,3 haval128,4 haval160,4 haval192,4 haval224,4 haval256,4 haval128,5 haval160,5 haval192,5 haval224,5 haval256,5 |
iconv support | enabled |
iconv implementation | "libiconv" |
iconv library version | 1.11 |
Directive | Local Value | Master Value |
---|---|---|
iconv.input_encoding | ISO-8859-1 | ISO-8859-1 |
iconv.internal_encoding | ISO-8859-1 | ISO-8859-1 |
iconv.output_encoding | ISO-8859-1 | ISO-8859-1 |
IMAP c-Client Version | 2004 |
SSL Support | enabled |
Firebird/InterBase Support | dynamic |
Compile-time Client Library Version | Interbase 6 |
Run-time Client Library Version | Firebird 1.0/Interbase 6 |
Directive | Local Value | Master Value |
---|---|---|
ibase.allow_persistent | On | On |
ibase.dateformat | %Y-%m-%d | %Y-%m-%d |
ibase.default_charset | no value | no value |
ibase.default_db | no value | no value |
ibase.default_password | no value | no value |
ibase.default_user | no value | no value |
ibase.max_links | Unlimited | Unlimited |
ibase.max_persistent | Unlimited | Unlimited |
ibase.timeformat | %H:%M:%S | %H:%M:%S |
ibase.timestampformat | %Y-%m-%d %H:%M:%S | %Y-%m-%d %H:%M:%S |
json support | enabled |
json version | 1.2.1 |
LDAP Support | enabled |
RCS Version | $Id: ldap.c,v 1.161.2.3.2.14 2008/12/31 11:17:39 sebastian Exp $ |
Total Links | 0/unlimited |
API Version | 2004 |
Vendor Name | OpenLDAP |
Vendor Version | 0 |
libXML support | active |
libXML Version | 2.7.3 |
libXML streams | enabled |
Multibyte Support | enabled |
Multibyte string engine | libmbfl |
Multibyte (japanese) regex support | enabled |
Multibyte regex (oniguruma) version | 4.4.4 |
Multibyte regex (oniguruma) backtrack check | On |
mbstring extension makes use of "streamable kanji code filter and converter", which is distributed under the GNU Lesser General Public License version 2.1. |
---|
Directive | Local Value | Master Value |
---|---|---|
mbstring.detect_order | no value | no value |
mbstring.encoding_translation | Off | Off |
mbstring.func_overload | 0 | 0 |
mbstring.http_input | pass | pass |
mbstring.http_output | pass | pass |
mbstring.internal_encoding | no value | no value |
mbstring.language | neutral | neutral |
mbstring.strict_detection | Off | Off |
mbstring.substitute_character | no value | no value |
mcrypt support | enabled |
---|---|
Version | 2.5.7 |
Api No | 20021217 |
Supported ciphers | cast-128 gost rijndael-128 twofish arcfour cast-256 loki97 rijndael-192 saferplus wake blowfish-compat des rijndael-256 serpent xtea blowfish enigma rc2 tripledes |
Supported modes | cbc cfb ctr ecb ncfb nofb ofb stream |
Directive | Local Value | Master Value |
---|---|---|
mcrypt.algorithms_dir | no value | no value |
mcrypt.modes_dir | no value | no value |
MHASH support | Enabled |
MHASH API Version | 20020524 |
mime_magic support | invalid magic file, disabled |
---|
Directive | Local Value | Master Value |
---|---|---|
mime_magic.debug | Off | Off |
mime_magic.magicfile | C:\php5\magic.mime | C:\php5\magic.mime |
Ming SWF output library | enabled |
Version | 0.3beta1 |
MSQL Support | enabled |
Allow Persistent Links | yes |
Persistent Links | 0/unlimited |
Total Links | 0/unlimited |
MySQL Support | enabled |
---|---|
Active Persistent Links | 0 |
Active Links | 0 |
Client API version | 5.0.51a |
Directive | Local Value | Master Value |
---|---|---|
mysql.allow_persistent | On | On |
mysql.connect_timeout | 60 | 60 |
mysql.default_host | no value | no value |
mysql.default_password | no value | no value |
mysql.default_port | no value | no value |
mysql.default_socket | no value | no value |
mysql.default_user | no value | no value |
mysql.max_links | Unlimited | Unlimited |
mysql.max_persistent | Unlimited | Unlimited |
mysql.trace_mode | Off | Off |
MysqlI Support | enabled |
---|---|
Client API library version | 5.0.51a |
Client API header version | 5.0.51a |
MYSQLI_SOCKET | /tmp/mysql.sock |
Directive | Local Value | Master Value |
---|---|---|
mysqli.default_host | no value | no value |
mysqli.default_port | 3306 | 3306 |
mysqli.default_pw | no value | no value |
mysqli.default_socket | no value | no value |
mysqli.default_user | no value | no value |
mysqli.max_links | Unlimited | Unlimited |
mysqli.reconnect | Off | Off |
ODBC Support | enabled |
---|---|
Active Persistent Links | 0 |
Active Links | 0 |
ODBC library | Win32 |
Directive | Local Value | Master Value |
---|---|---|
odbc.allow_persistent | On | On |
odbc.check_persistent | On | On |
odbc.default_cursortype | Static cursor | Static cursor |
odbc.default_db | no value | no value |
odbc.default_pw | no value | no value |
odbc.default_user | no value | no value |
odbc.defaultbinmode | return as is | return as is |
odbc.defaultlrl | return up to 4096 bytes | return up to 4096 bytes |
odbc.max_links | Unlimited | Unlimited |
odbc.max_persistent | Unlimited | Unlimited |
OpenSSL support | enabled |
OpenSSL Version | OpenSSL 0.9.8k 25 Mar 2009 |
PCRE (Perl Compatible Regular Expressions) Support | enabled |
PCRE Library Version | 7.8 2008-09-05 |
Directive | Local Value | Master Value |
---|---|---|
pcre.backtrack_limit | 100000 | 100000 |
pcre.recursion_limit | 100000 | 100000 |
PDO support | enabled |
---|---|
PDO drivers | firebird, mysql, odbc, sqlite2 |
PDO Driver for Firebird/InterBase | enabled |
---|
PDO Driver for MySQL, client library version | 5.0.51a |
---|
PDO Driver for ODBC (Win32) | enabled |
---|---|
ODBC Connection Pooling | Enabled, strict matching |
Reflection | enabled |
---|---|
Version | $Id: php_reflection.c,v 1.164.2.33.2.55 2008/12/31 11:17:42 sebastian Exp $ |
Session Support | enabled |
Registered save handlers | files user sqlite |
Registered serializer handlers | php php_binary wddx |
Directive | Local Value | Master Value |
---|---|---|
session.auto_start | Off | Off |
session.bug_compat_42 | Off | Off |
session.bug_compat_warn | On | On |
session.cache_expire | 180 | 180 |
session.cache_limiter | nocache | nocache |
session.cookie_domain | no value | no value |
session.cookie_httponly | Off | Off |
session.cookie_lifetime | 0 | 0 |
session.cookie_path | / | / |
session.cookie_secure | Off | Off |
session.entropy_file | no value | no value |
session.entropy_length | 0 | 0 |
session.gc_divisor | 1000 | 1000 |
session.gc_maxlifetime | 10 | 10 |
session.gc_probability | 1 | 1 |
session.hash_bits_per_character | 5 | 5 |
session.hash_function | 0 | 0 |
session.name | PHPSESSID | PHPSESSID |
session.referer_check | no value | no value |
session.save_handler | files | files |
session.save_path | C:\WINDOWS\Tmp | C:\WINDOWS\Tmp |
session.serialize_handler | php | php |
session.use_cookies | On | On |
session.use_only_cookies | Off | Off |
session.use_trans_sid | 0 | 0 |
shmop support | enabled |
Simplexml support | enabled |
---|---|
Revision | $Revision: 1.151.2.22.2.46 $ |
Schema support | enabled |
Soap Client | enabled |
Soap Server | enabled |
Directive | Local Value | Master Value |
---|---|---|
soap.wsdl_cache | 1 | 1 |
soap.wsdl_cache_dir | /tmp | /tmp |
soap.wsdl_cache_enabled | 1 | 1 |
soap.wsdl_cache_limit | 5 | 5 |
soap.wsdl_cache_ttl | 86400 | 86400 |
Sockets Support | enabled |
SPL support | enabled |
---|---|
Interfaces | Countable, OuterIterator, RecursiveIterator, SeekableIterator, SplObserver, SplSubject |
Classes | AppendIterator, ArrayIterator, ArrayObject, BadFunctionCallException, BadMethodCallException, CachingIterator, DirectoryIterator, DomainException, EmptyIterator, FilterIterator, InfiniteIterator, InvalidArgumentException, IteratorIterator, LengthException, LimitIterator, LogicException, NoRewindIterator, OutOfBoundsException, OutOfRangeException, OverflowException, ParentIterator, RangeException, RecursiveArrayIterator, RecursiveCachingIterator, RecursiveDirectoryIterator, RecursiveFilterIterator, RecursiveIteratorIterator, RecursiveRegexIterator, RegexIterator, RuntimeException, SimpleXMLIterator, SplFileInfo, SplFileObject, SplObjectStorage, SplTempFileObject, UnderflowException, UnexpectedValueException |
SQLite support | enabled |
---|---|
PECL Module version | 2.0-dev $Id: sqlite.c,v 1.166.2.13.2.12 2008/12/31 11:17:44 sebastian Exp $ |
SQLite Library | 2.8.17 |
SQLite Encoding | iso8859 |
Directive | Local Value | Master Value |
---|---|---|
sqlite.assoc_case | 0 | 0 |
Regex Library | Bundled library enabled |
Dynamic Library Support | enabled |
Internal Sendmail Support for Windows | enabled |
Directive | Local Value | Master Value |
---|---|---|
assert.active | 1 | 1 |
assert.bail | 0 | 0 |
assert.callback | no value | no value |
assert.quiet_eval | 0 | 0 |
assert.warning | 1 | 1 |
auto_detect_line_endings | 0 | 0 |
default_socket_timeout | 60 | 60 |
safe_mode_allowed_env_vars | PHP_ | PHP_ |
safe_mode_protected_env_vars | LD_LIBRARY_PATH | LD_LIBRARY_PATH |
url_rewriter.tags | a=href,area=href,frame=src,input=src,form=fakeentry | a=href,area=href,frame=src,input=src,form=fakeentry |
user_agent | no value | no value |
Tidy support | enabled |
---|---|
libTidy Release | 15 August 2007 |
Extension Version | 2.0 ($Id: tidy.c,v 1.66.2.8.2.26 2008/12/31 11:17:46 sebastian Exp $) |
Directive | Local Value | Master Value |
---|---|---|
tidy.clean_output | no value | no value |
tidy.default_config | no value | no value |
Tokenizer Support | enabled |
WDDX Support | enabled |
---|---|
WDDX Session Serializer | enabled |
XML Support | active |
XML Namespace Support | active |
libxml2 Version | 2.7.3 |
XMLReader | enabled |
core library version | xmlrpc-epi v. 0.51 |
php extension version | 0.51 |
author | Dan Libby |
homepage | http://xmlrpc-epi.sourceforge.net |
open sourced by | Epinions.com |
XMLWriter | enabled |
XSL | enabled |
libxslt Version | 1.1.23 |
libxslt compiled against libxml Version | 2.6.32 |
EXSLT | enabled |
libexslt Version | 0.8.13 |
Zip | enabled |
Extension Version | $Id: php_zip.c,v 1.1.2.49 2009/02/05 19:53:22 pajoye Exp $ |
Zip version | 1.8.11 |
Libzip version | 0.9.0 |
ZLib Support | enabled |
Stream Wrapper support | compress.zlib:// |
Stream Filter support | zlib.inflate, zlib.deflate |
Compiled Version | 1.2.3 |
Linked Version | 1.2.3 |
Directive | Local Value | Master Value |
---|---|---|
zlib.output_compression | Off | Off |
zlib.output_compression_level | -1 | -1 |
zlib.output_handler | no value | no value |
Module Name |
---|
dbase |
Variable | Value |
---|---|
ALLUSERSPROFILE | C:\ProgramData |
APPDATA | C:\Windows\system32\config\systemprofile\AppData\Roaming |
CommonProgramFiles | C:\Program Files (x86)\Common Files |
CommonProgramFiles(x86) | C:\Program Files (x86)\Common Files |
CommonProgramW6432 | C:\Program Files\Common Files |
COMPUTERNAME | WIN2019WEB |
ComSpec | C:\Windows\system32\cmd.exe |
DriverData | C:\Windows\System32\Drivers\DriverData |
LOCALAPPDATA | C:\Windows\system32\config\systemprofile\AppData\Local |
NUMBER_OF_PROCESSORS | 32 |
OS | Windows_NT |
Path | E:\PHP\;C:\Windows\system32;C:\Windows;C:\Windows\System32\Wbem;C:\Windows\System32\WindowsPowerShell\v1.0\;C:\Windows\System32\OpenSSH\;E:\Program Files (x86)\MySQL\MySQL Server 5.1\bin;E:\PHP\ext\;C:\Windows\system32\config\systemprofile\AppData\Local\Microsoft\WindowsApps |
PATHEXT | .COM;.EXE;.BAT;.CMD;.VBS;.VBE;.JS;.JSE;.WSF;.WSH;.MSC |
PHPRC | E:\PHP\ |
PROCESSOR_ARCHITECTURE | x86 |
PROCESSOR_ARCHITEW6432 | AMD64 |
PROCESSOR_IDENTIFIER | Intel64 Family 6 Model 63 Stepping 2, GenuineIntel |
PROCESSOR_LEVEL | 6 |
PROCESSOR_REVISION | 3f02 |
ProgramData | C:\ProgramData |
ProgramFiles | C:\Program Files (x86) |
ProgramFiles(x86) | C:\Program Files (x86) |
ProgramW6432 | C:\Program Files |
PSModulePath | C:\Program Files\WindowsPowerShell\Modules;C:\Windows\system32\WindowsPowerShell\v1.0\Modules;C:\Program Files\Microsoft Monitoring Agent\Agent\PowerShell\ |
PUBLIC | C:\Users\Public |
SystemDrive | C: |
SystemRoot | C:\Windows |
TEMP | C:\Windows\TEMP |
TMP | C:\Windows\TEMP |
USERDOMAIN | FREE-ISLAM |
USERNAME | WIN2019WEB$ |
USERPROFILE | C:\Windows\system32\config\systemprofile |
windir | C:\Windows |
HTTP_ACCEPT | */* |
HTTP_ACCEPT_ENCODING | gzip, br, zstd, deflate |
HTTP_HOST | access-quran.com |
HTTP_USER_AGENT | Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com) |
APP_POOL_ID | DefaultAppPool |
AUTH_TYPE | no value |
AUTH_PASSWORD | no value |
AUTH_USER | no value |
CERT_COOKIE | no value |
CERT_FLAGS | no value |
CERT_ISSUER | no value |
CERT_SERIALNUMBER | no value |
CERT_SUBJECT | no value |
CONTENT_LENGTH | 0 |
CONTENT_TYPE | no value |
GATEWAY_INTERFACE | CGI/1.1 |
HTTPS | off |
HTTPS_KEYSIZE | no value |
HTTPS_SECRETKEYSIZE | no value |
HTTPS_SERVER_ISSUER | no value |
HTTPS_SERVER_SUBJECT | no value |
INSTANCE_ID | 1 |
LOCAL_ADDR | 192.168.0.148 |
LOGON_USER | no value |
PATH_TRANSLATED | E:\Bnuke\phpinfo.php |
QUERY_STRING | a%5B%5D=%3Ca+href%3Dhttps%3A%2F%2Fmsprojectformac.com |
REMOTE_ADDR | 18.222.168.158 |
REMOTE_HOST | 18.222.168.158 |
REMOTE_USER | no value |
REQUEST_METHOD | GET |
SCRIPT_NAME | /phpinfo.php |
SERVER_NAME | access-quran.com |
SERVER_PORT | 80 |
SERVER_PORT_SECURE | 0 |
SERVER_PROTOCOL | HTTP/1.1 |
SERVER_SOFTWARE | Microsoft-IIS/10.0 |
UNMAPPED_REMOTE_USER | no value |
ORIG_PATH_INFO | /phpinfo.php |
SCRIPT_FILENAME | E:\Bnuke\phpinfo.php |
Variable | Value |
---|---|
_REQUEST["a"] | Array ( [0] => <a href=https://msprojectformac.com ) |
_GET["a"] | Array ( [0] => <a href=https://msprojectformac.com ) |
_SERVER["ALLUSERSPROFILE"] | C:\ProgramData |
_SERVER["APPDATA"] | C:\Windows\system32\config\systemprofile\AppData\Roaming |
_SERVER["CommonProgramFiles"] | C:\Program Files (x86)\Common Files |
_SERVER["CommonProgramFiles(x86)"] | C:\Program Files (x86)\Common Files |
_SERVER["CommonProgramW6432"] | C:\Program Files\Common Files |
_SERVER["COMPUTERNAME"] | WIN2019WEB |
_SERVER["ComSpec"] | C:\Windows\system32\cmd.exe |
_SERVER["DriverData"] | C:\Windows\System32\Drivers\DriverData |
_SERVER["LOCALAPPDATA"] | C:\Windows\system32\config\systemprofile\AppData\Local |
_SERVER["NUMBER_OF_PROCESSORS"] | 32 |
_SERVER["OS"] | Windows_NT |
_SERVER["Path"] | E:\PHP\;C:\Windows\system32;C:\Windows;C:\Windows\System32\Wbem;C:\Windows\System32\WindowsPowerShell\v1.0\;C:\Windows\System32\OpenSSH\;E:\Program Files (x86)\MySQL\MySQL Server 5.1\bin;E:\PHP\ext\;C:\Windows\system32\config\systemprofile\AppData\Local\Microsoft\WindowsApps |
_SERVER["PATHEXT"] | .COM;.EXE;.BAT;.CMD;.VBS;.VBE;.JS;.JSE;.WSF;.WSH;.MSC |
_SERVER["PHPRC"] | E:\PHP\ |
_SERVER["PROCESSOR_ARCHITECTURE"] | x86 |
_SERVER["PROCESSOR_ARCHITEW6432"] | AMD64 |
_SERVER["PROCESSOR_IDENTIFIER"] | Intel64 Family 6 Model 63 Stepping 2, GenuineIntel |
_SERVER["PROCESSOR_LEVEL"] | 6 |
_SERVER["PROCESSOR_REVISION"] | 3f02 |
_SERVER["ProgramData"] | C:\ProgramData |
_SERVER["ProgramFiles"] | C:\Program Files (x86) |
_SERVER["ProgramFiles(x86)"] | C:\Program Files (x86) |
_SERVER["ProgramW6432"] | C:\Program Files |
_SERVER["PSModulePath"] | C:\Program Files\WindowsPowerShell\Modules;C:\Windows\system32\WindowsPowerShell\v1.0\Modules;C:\Program Files\Microsoft Monitoring Agent\Agent\PowerShell\ |
_SERVER["PUBLIC"] | C:\Users\Public |
_SERVER["SystemDrive"] | C: |
_SERVER["SystemRoot"] | C:\Windows |
_SERVER["TEMP"] | C:\Windows\TEMP |
_SERVER["TMP"] | C:\Windows\TEMP |
_SERVER["USERDOMAIN"] | FREE-ISLAM |
_SERVER["USERNAME"] | WIN2019WEB$ |
_SERVER["USERPROFILE"] | C:\Windows\system32\config\systemprofile |
_SERVER["windir"] | C:\Windows |
_SERVER["HTTP_ACCEPT"] | */* |
_SERVER["HTTP_ACCEPT_ENCODING"] | gzip, br, zstd, deflate |
_SERVER["HTTP_HOST"] | access-quran.com |
_SERVER["HTTP_USER_AGENT"] | Mozilla/5.0 AppleWebKit/537.36 (KHTML, like Gecko; compatible; ClaudeBot/1.0; +claudebot@anthropic.com) |
_SERVER["APP_POOL_ID"] | DefaultAppPool |
_SERVER["AUTH_TYPE"] | no value |
_SERVER["AUTH_PASSWORD"] | no value |
_SERVER["AUTH_USER"] | no value |
_SERVER["CERT_COOKIE"] | no value |
_SERVER["CERT_FLAGS"] | no value |
_SERVER["CERT_ISSUER"] | no value |
_SERVER["CERT_SERIALNUMBER"] | no value |
_SERVER["CERT_SUBJECT"] | no value |
_SERVER["CONTENT_LENGTH"] | 0 |
_SERVER["CONTENT_TYPE"] | no value |
_SERVER["GATEWAY_INTERFACE"] | CGI/1.1 |
_SERVER["HTTPS"] | off |
_SERVER["HTTPS_KEYSIZE"] | no value |
_SERVER["HTTPS_SECRETKEYSIZE"] | no value |
_SERVER["HTTPS_SERVER_ISSUER"] | no value |
_SERVER["HTTPS_SERVER_SUBJECT"] | no value |
_SERVER["INSTANCE_ID"] | 1 |
_SERVER["LOCAL_ADDR"] | 192.168.0.148 |
_SERVER["LOGON_USER"] | no value |
_SERVER["PATH_TRANSLATED"] | E:\Bnuke\phpinfo.php |
_SERVER["QUERY_STRING"] | a%5B%5D=%3Ca+href%3Dhttps%3A%2F%2Fmsprojectformac.com |
_SERVER["REMOTE_ADDR"] | 18.222.168.158 |
_SERVER["REMOTE_HOST"] | 18.222.168.158 |
_SERVER["REMOTE_USER"] | no value |
_SERVER["REQUEST_METHOD"] | GET |
_SERVER["SCRIPT_NAME"] | /phpinfo.php |
_SERVER["SERVER_NAME"] | access-quran.com |
_SERVER["SERVER_PORT"] | 80 |
_SERVER["SERVER_PORT_SECURE"] | 0 |
_SERVER["SERVER_PROTOCOL"] | HTTP/1.1 |
_SERVER["SERVER_SOFTWARE"] | Microsoft-IIS/10.0 |
_SERVER["UNMAPPED_REMOTE_USER"] | no value |
_SERVER["ORIG_PATH_INFO"] | /phpinfo.php |
_SERVER["SCRIPT_FILENAME"] | E:\Bnuke\phpinfo.php |
_SERVER["PHP_SELF"] | /phpinfo.php |
_SERVER["REQUEST_TIME"] | 1729117854 |
This program is free software; you can redistribute it and/or modify it under the terms of the PHP License as published by the PHP Group and included in the distribution in the file: LICENSE This program is distributed in the hope that it will be useful, but WITHOUT ANY WARRANTY; without even the implied warranty of MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE. If you did not receive a copy of the PHP license, or have any questions about PHP licensing, please contact license@php.net. |